Lacing in a new floor to a floor you already have. 

For a full list of install services:

Call Jason Reed

918-946-9587

​jason_reed75@yahoo.com

Copyright Paramount Flooring. All rights reserved. 

After we lace in the new floor we sand and finish so that you can never tell it was any different.

Racking out the floor

Racking out the floor

Paramount Flooring installs our wood floors according to the National Wood Flooring Associations guidelines.


  • 6 mil plastic moisture barrier
  • 5/8" plywood sub-floor (1.5" concrete pins to secure plywood to foundation)
  • 15 lb felt paper
  • 3/4" flooring of your choice
  • Stain & Polyurethane 


The installation practices that we use has been time tested so you know that your wood floor will last for many years.